On the territory of the heavy engineering complex of the OKB Mikron (part of the KANEX group), the first stage of the TITAN machine foundation construction is over. It took 42 days for the OKB Mikron workers to form a pit and complete the installation of a protective dome. The cut amounted to 2,600 m3, the pit dimensions — 20x21 m, the depth — 6.5 m. 156 piles were driven to a depth of 10 m. The area of the protective dome is 520 m2, the dimensions are 21x20x5 m.